Bitrix24 calculator

Estimate the cost of a Bitrix24 implementation and its first release

Budget, first release scope and the Cloud vs Box difference in a couple of minutes. Then a proposal with phases and a launch recommendation — no long email threads.

Cloud or Boxfirst release scopeCRM, integrations, rolesrange before the estimate
Scales with your team

Priced by headcount and way of working, not one flat number for everyone.

Matches your processes

Pick CRM, service, documents, HR and integrations — and see what drives the budget.

A clear next step

Send your context after the estimate and get a proposal for the first release.

4 of 5
scope
01

Which deployment format do you need?

Cloud
02

How many people will work in Bitrix24?

25 users
1300+
03

Which tasks do you need Bitrix24 for?

1 selected
04

Which integrations are required?

0 selected
05

What else should we include?

1 selected
06

Get a proposal and a phased implementation plan

6,310–8,060 BYN

By pressing the button you agree to the processing of personal data under the Privacy policy (in Russian). We reply within one business day.

  • Working under contract: we fix phases, scope, roles and the access order.
  • No overload for your team: you know what ships in the first release and what can wait.

What the estimate covers

  • Base scope: roles, CRM, structure, core settings and launch.
  • Complexity by headcount and by the number of workflows.
  • Integrations, data migration, team training and extra work.

What is not included

  • Bitrix24 licence, telephony, SMS, cloud subscriptions and external APIs.
  • Deep process re-engineering and heavy custom development.
  • Server infrastructure and the DevOps perimeter for the box — after the audit.

Why the number changes after the audit

  • The review surfaces extra roles, departments, non-standard approvals, 1C constraints and security requirements.
  • We do not inflate the whole project: we isolate the first release and give a budget per phase instead of one number without context.

Implementation phases

  • 01
    Process and goal audit

    We look at how leads, deals, approvals and service run.

  • 02
    First release design

    CRM structure, roles, pipelines and the integration list.

  • 03
    Configuration and integrations

    Portal, records, robots, reports and external systems.

  • 04
    Training and launch

    The team moves into the new process with launch support.

Implementation estimate FAQ

It is a range for the first release, not a quote. An exact estimate appears after a short review of your process, the integration scope, data migration and the launch format.

The audit may surface extra roles, non-standard approvals, 1C constraints, complex migration or an on-premise deployment with its own infrastructure. The calculator shows an honest range instead of a fake precise number.

Yes. We usually define the first release: CRM, pipeline, roles, core integrations and training. Documents, helpdesk, HR and advanced analytics can follow later.

A short description of the current process: how many people will use the system, which systems you already have, which integrations are mandatory and what you want to improve first.

Yes. Scope, phases, responsibilities, roles and access are fixed in the contract. We sign an NDA before you share internal process details, if needed.