Estimate the cost of a Bitrix24 implementation and its first release
Budget, first release scope and the Cloud vs Box difference in a couple of minutes. Then a proposal with phases and a launch recommendation — no long email threads.
Priced by headcount and way of working, not one flat number for everyone.
Pick CRM, service, documents, HR and integrations — and see what drives the budget.
Send your context after the estimate and get a proposal for the first release.
Which deployment format do you need?
CloudHow many people will work in Bitrix24?
25 usersWhich tasks do you need Bitrix24 for?
1 selectedWhich integrations are required?
0 selectedWhat else should we include?
1 selectedGet a proposal and a phased implementation plan
6,310–8,060 BYN- Working under contract: we fix phases, scope, roles and the access order.
- No overload for your team: you know what ships in the first release and what can wait.
What the estimate covers
- Base scope: roles, CRM, structure, core settings and launch.
- Complexity by headcount and by the number of workflows.
- Integrations, data migration, team training and extra work.
What is not included
- Bitrix24 licence, telephony, SMS, cloud subscriptions and external APIs.
- Deep process re-engineering and heavy custom development.
- Server infrastructure and the DevOps perimeter for the box — after the audit.
Why the number changes after the audit
- The review surfaces extra roles, departments, non-standard approvals, 1C constraints and security requirements.
- We do not inflate the whole project: we isolate the first release and give a budget per phase instead of one number without context.
Implementation phases
- 01Process and goal audit
We look at how leads, deals, approvals and service run.
- 02First release design
CRM structure, roles, pipelines and the integration list.
- 03Configuration and integrations
Portal, records, robots, reports and external systems.
- 04Training and launch
The team moves into the new process with launch support.
Implementation estimate FAQ
It is a range for the first release, not a quote. An exact estimate appears after a short review of your process, the integration scope, data migration and the launch format.
The audit may surface extra roles, non-standard approvals, 1C constraints, complex migration or an on-premise deployment with its own infrastructure. The calculator shows an honest range instead of a fake precise number.
Yes. We usually define the first release: CRM, pipeline, roles, core integrations and training. Documents, helpdesk, HR and advanced analytics can follow later.
A short description of the current process: how many people will use the system, which systems you already have, which integrations are mandatory and what you want to improve first.
Yes. Scope, phases, responsibilities, roles and access are fixed in the contract. We sign an NDA before you share internal process details, if needed.
Where to go next
Full launch of CRM, roles, pipelines and the first release.
Stabilisation, fixes and an SLA perimeter for a live portal.
Cloud, box and the licence scope for your scenario.
30 minutes to go through the process and the first release scope.