Case studies / One platform for 50+ branches

Enterprise ERP · Logistics & high load

One platform for 50+ branches

A logistics network with 50+ branches ran its core operations on a monolith that could not keep up: order processing took around four hours, seasonal peaks pushed the central contour to its limit, and a single problematic node could stop daily operations.

15

Minutes per order

Previously about 4 hours

99.99%

Availability

SLA for the key contour

50+

Branches

Work in one system

What we did

Scope of work in this project

  • Removed the architectural limits that made order processing slow
  • Moved the critical scenario to a contour that survives load peaks and component failures
  • Shortened the order path to a predictable, observable scenario
  • Prepared the platform for network growth and further branching
Result

What changed for the business

Order processing dropped from about 4 hours to 15 minutes

The core contour holds a 99.99% availability SLA and stopped being a source of peak-hour incidents

Operations teams no longer depend on manual workarounds around a slow monolith

Services involved
More cases

A similar process in your company?

We can walk through this project in detail: what the system replaced, how it was built and what it takes to launch something comparable.