Order processing dropped from about 4 hours to 15 minutes
Case studies / One platform for 50+ branches
Enterprise ERP · Logistics & high loadOne platform for 50+ branches
A logistics network with 50+ branches ran its core operations on a monolith that could not keep up: order processing took around four hours, seasonal peaks pushed the central contour to its limit, and a single problematic node could stop daily operations.
Minutes per order
Previously about 4 hours
Availability
SLA for the key contour
Branches
Work in one system
Scope of work in this project
- Removed the architectural limits that made order processing slow
- Moved the critical scenario to a contour that survives load peaks and component failures
- Shortened the order path to a predictable, observable scenario
- Prepared the platform for network growth and further branching
What changed for the business
The core contour holds a 99.99% availability SLA and stopped being a source of peak-hour incidents
Operations teams no longer depend on manual workarounds around a slow monolith
High-load systems & backend architecture
Backend contours and B2B platforms designed for growing load, integrations and business-critical operations.
Custom web applications & B2B portals
Client cabinets, portals, internal services and mobile products built around the way your business actually operates.
DevOps & server administration
Server operations, safe releases, backups and monitoring so that infrastructure stops being a single point of failure.
A similar process in your company?
We can walk through this project in detail: what the system replaced, how it was built and what it takes to launch something comparable.